Test environment running 7.6.6

Cultural advice

The Australian National University acknowledges, celebrates and pays our respects to the Ngunnawal and Ngambri people of the Canberra region and to all First Nations Australians on whose traditional lands we meet and work, and whose cultures are among the oldest continuing cultures in human history.

Aboriginal and Torres Strait Islander peoples are advised that ANU Library collections may include images, names, voices, and other representations of deceased persons.

Material in the collection may contain terms, language or views that reflect the period in which the item was created and may be considered inappropriate today.

A Computational Method for Estimating Travel Frequencies in Site Layout Planning

Loading...
Thumbnail Image

Journal Title

Journal ISSN

Volume Title

Publisher

Abstract

Optimizing the layout of facilities on a construction site to minimize the material handling costs has been widely investigated in the literature. An integral part of the objective function utilized in the previously proposed optimization models is the frequency parameter, which generally provides a rough estimate of the frequency of travel between each pair of facilities at a specific stage of the project. The majority of travel frequencies deduced in prior studies have been estimated merely based on past experience and may not be an actual representation of movements within the project studied. There is currently a lack of a systematic approach for estimating travel frequencies, required in site layout planning, based on the information available at early stages of the project. Obtaining a reasonable estimate of the travel frequency matrix requires a realistic evaluation of the material transportation quantities at each construction stage. This necessitates the utilization of information on the progress of different activities and their corresponding material needs during the various stages. This paper presents a framework for obtaining travel frequencies at different construction project phases by taking advantage of the information made available by building information models and project schedules. The estimated frequencies are later embedded as parameters in an optimization model to improve site layout planning. The results of a case study are presented to highlight the capabilities of the proposed framework.

Description

Citation

Source

Journal of Construction Engineering and Management

Book Title

Entity type

Access Statement

License Rights

Restricted until