Test environment running 7.6.6

Cultural advice

The Australian National University acknowledges, celebrates and pays our respects to the Ngunnawal and Ngambri people of the Canberra region and to all First Nations Australians on whose traditional lands we meet and work, and whose cultures are among the oldest continuing cultures in human history.

Aboriginal and Torres Strait Islander peoples are advised that ANU Library collections may include images, names, voices, and other representations of deceased persons.

Material in the collection may contain terms, language or views that reflect the period in which the item was created and may be considered inappropriate today.

A risk-based approach to inspection planning for pipelines considering the coupling effect of corrosion and dents

Loading...
Thumbnail Image

Date

Journal Title

Journal ISSN

Volume Title

Publisher

Abstract

RBI, referring to a risk-based approach to inspection planning, is an established pipeline integrity management method. Both corrosion and dents are the primary threats to pipeline integrity. However, they are often treated separately in RBI without considering their interactions. This coupling may lead to a synergic effect on integrity degradation. The present study proposes an RBI planning framework for pipelines considering external corrosion and dents. Time-dependent pipeline deterioration by dents and corrosion is modeled probabilistically using a Dynamic Bayesian Network (DBN), in-line inspection (ILI) data, and corrosion propagation knowledge. Two failure scenarios (leakage and burst) are considered. The hybrid method, integrating Monte Carlo Simulation (MCS) and Latin Hypercube Sampling (LHS) technique, estimates the pipeline's Probability of Failure (PoF) over time. The pipeline failure risk is quantified by monetizing the Consequence of Failure (CoF). An optimization model of loss-maintenance total expected cost is introduced to determine the optimum inspection period using maximum acceptable risk (MAR) and the lowest total expected cost. A cost-benefit analysis (CBA) is finally implemented to choose appropriate risk reduction measures. The proposed framework is robust and well-validated by a case study on an in-service pipeline.

Description

Citation

Source

Process Safety and Environmental Protection

Book Title

Entity type

Access Statement

License Rights

Restricted until