In 2018, according to the transmission planning scheme evaluated in 2005, a large amount of hydro power in southwest China is projected to transmit to east and central China through four ±800 kV ultra high voltage direct current (UHVDC) links and some parallel 1000 kV ultra high voltage alternating current (UHVAC) transmission lines. In order to examine the technical feasibility of this scheme, a series of study were carried out using a hybrid real-time simulator. The network performance based on minor and severe emergencies was investigated. The interactions among ±800 kV DC links, connected AC system and the impact of multi-infeed DC power on east-China network were analyzed. The results show that the 2018 power grid scheme is feasible from the transmission system security and stability perspective. However, some areas of the transmission system reflected lower than anticipated voltage when ±800 kV UHVDC bipolar emergency outage occurs. It is recommended that reactive power compensation can be installed for voltage improvement. This feasibility study also revealed that when high enough over-voltage occurs at rectifier commutation bus, it may result in commutation failure at the inverters. Hence, for three of the UHVDC links mentioned in this paper (whose locations of rectifier stations are close in proximity), when bipolar emergency outage occurs at one of them, it could lead to commutation failure at other two inverters due to the over-voltage at commutation buses of the rectifiers.
Description
Citation
Collections
Source
Zhongguo Dianji Gongcheng Xuebao/Proceedings of the Chinese Society of Electrical Engineering